
Installation & Positioning
Twelve camera installation lessons covering site surveys, positioning, cabling, weather protection and commissioning checks.
Twelve practical lessons connect site survey, mounting geometry, face and plate capture, cabling, weather protection and final acceptance.
Survey. Position. Test the evidence.
A clean image is not enough. The installed camera must prove its required task under real day, night and motion conditions.
Site Survey Before Mounting
Turn the operational objective into a documented camera position before drilling begins.
Mounting Height and Evidence
Balance coverage, target angle and useful evidence instead of choosing height by habit.
Tilt, Roll and Perspective
Control tilt, level and perspective so geometry supports identification and analytics.
Face Capture Camera Placement
Place the camera where faces are naturally visible, frontal and large enough to verify.
Vehicle Entrances: Overview vs Evidence
Separate situational overview from the dedicated evidence task at vehicle entrances.
Blind Spots and Coverage Overlap
Map occlusion and overlap so critical movement stays visible across camera transitions.
LPR Camera Setup for Controlled Gates
Engineer a controlled lane for readable plates, stable timing and barrier integration.
LPR Camera Setup for Roads
Match lane geometry, capture distance and shutter strategy to moving road traffic.
Glass, Reflections and Infrared
Prevent reflections and IR bounce before they destroy useful night evidence.
Outdoor Mounting, Weather and Vibration
Protect image stability and service life against wind, water, heat and vibration.
Cabling, PoE and Surge Protection
Design the cable path, power budget, grounding and surge protection as one system.
Commissioning and Acceptance
Verify day, night, motion, recording and evidence tasks before formal handover.